The National Grid Corporation of the Philippines (NGCP) once again raised a Yellow Alert in the Visayas grid on Wednesday, August 6.

In an advisory issued at 7 a.m., the alert is in effect from 3 p.m. to 4 p.m. and 5 p.m. to 7 p.m.

According to the update, the available capacity is 2,538 megawatts (MW), while peak demand is at 2,369 MW.

Visayas plants on unplanned/forced outage:

  • SCBI – 7.4MW
  • HPC U1 – 2MW
  • VMC 1 – 2.5MW
  • EAUC U1 – 11.5MW
  • CARMEN DIESEL U4 – 10MW
  • SCBP – 19.5MW
  • SNBP – 25MW
  • BISCOM BIOMASS – 12.7MW
  • VMC 2 – 35MW
  • NNBP – 25MW
  • CASA 2 BIOMASS – 7MW
  • 1ST FARMER BIOMASS – 9MW
  • CASA BIOMASS – 8MW
  • HPC U2 – 9.5MW
  • CABI BIOMASS – 12MW
  • URC BIOMASS - 20MW
  • TVI U2 - 169MW

Plants with de-rated capacities: 

  • CALBAYOG DIESEL – 10.5MW (de-rated by 0.5MW)
  • LEYTE A – 192MW (de-rated by 298.1MW)
  • PGPP2 SOG1 – 19.5MW (de-rated by 0.5MW)
  • TGPP – 79.5MW (de-rated by 41MW)

There are a total of 5 days of Yellow alert occurrences in 2025. All events happened from August 1 to August 6, reflecting elevated stress in the grid from outages and scarcity in reserves. 

Meanwhile, the Luzon and Mindanao grids are under normal condition.